Quick Scaffolding Assembly- Platform Method- Jumply Scaffold

Today we’d like to introduce a quick scaffolding assembly method- Platform Method, carried out by #jumplyscaffolding engineering team.

Scaffolding type: Ringlock/ Octagonlock system (Multi-directional) scaffolding

Suitable project type: Regular shape constructions (eg. Cuboid, without any block inside)

Benefits: Time saving Labor saving in a great efficiency

First let’s take a look at our project example video (Wuxi Hailian Workshop Project):

The Wuxi Hailian Project totally has 2 floors above the ground, with a total construction area of 36016 m2 and a structural height of 22.8 meters.

After calculation,

-The maximum formwork support height of the project is 14 meters,

-The maximum beam section is 0.4*1.5m, and the maximum linear load design value is 21.29 kN/m.

Quick Scaffolding Assembly

Quick Scaffolding Assembly 1

 

How to assemble in this Platform Method?

1st Step:

Set up a full house support frame from ground, and all the standards support directly to the bottom of beam. (Head jacks + Rapid Scaffold C beams)

Quick Scaffolding Assembly 2

2nd Step:

Lay the beam bottom template and set up the slab bottom bracket. (Erected above the C beams)

Quick Scaffolding Assembly 3

3rd Step:

Complete the formwork system and pour concrete.

Quick Scaffolding Assembly 4

Actual site photos:

Quick Scaffolding Assembly 5

Quick Scaffolding Assembly 6

Get A Quote Now !

Get A Free Quote